Our Services

Transparent MEP estimating
that is easier to control

From quantity take-off and BOQ preparation to cost control, we help owners and contractors make decisions from clear files and managed review steps.

Detailed MEP estimation

Quantity take-off and cost calculation for mechanical, electrical, and plumbing systems from design documents.

Work scope

  • Review MEP drawings
  • Take off quantities by system
  • Structure costs by item

Deliverables

  • Quantity sheet
  • Detailed estimate
  • Scope notes and assumptions

Working method

  • Separate mechanical, electrical, and plumbing systems
  • Cross-check drawings and item lists
  • Review logic before handover

Bill of Quantities (BOQ) Preparation

Structured quantity schedules for tendering, quotation comparison, and contract management.

Work scope

  • Classify items
  • Standardize units
  • Organize quantity schedules

Deliverables

  • Structured BOQ
  • Item list
  • Scope interpretation notes

Working method

  • Check against drawings
  • Group items by system
  • Review consistency

Project cost control

Track estimates, budgets, and cost changes so project teams can make informed decisions.

Work scope

  • Track budget
  • Record changes
  • Review cost variance

Deliverables

  • Cost tracking table
  • Confirmation list
  • Scope-based summary report

Working method

  • Compare against baseline
  • Update changes
  • Summarize cost risks

Technical consultation & Value Engineering

Review technical scope and compare cost-impacting options when a project needs another view.

Work scope

  • Review technical scope
  • Compare options
  • Clarify estimate assumptions

Deliverables

  • Consultation notes
  • Confirmation list
  • Reference options by scope

Working method

  • Read drawings and requirements
  • Discuss with project team
  • Summarize technical comments

Preliminary total investment estimate

Early-stage investment budget estimate before design documents are fully completed.

Work scope

  • Define preliminary scope
  • Group investment costs
  • Record key assumptions

Deliverables

  • Preliminary budget sheet
  • Cost group summary
  • Assumptions and missing-item list

Working method

  • Use available documents
  • Separate cost groups
  • State level-of-detail limits

Not sure which service fits?

Talk with our estimating team to define the scope you need.

Request Consultation

Deliverables

Clear inputs, reviewable outputs

Files clients provide

  • Design drawings
  • Work scope
  • Template requirements
  • Expected timeline
  • Related technical documents

Files we hand over

  • Quantity take-off sheet
  • Structured BOQ
  • Rate and cost summary
  • Assumptions and notes
  • Excel/PDF files by agreed scope

Estimating process controlled through 5 steps

From drawing intake to file handover, each phase has a clear output and review step.

  1. Receive documents

    Collect drawings, work scope, format requirements, and expected timeline.

  2. Analyze scope

    Clarify MEP systems, assumptions, missing items, and points requiring confirmation.

  3. Take off & calculate

    Measure quantities and prepare cost tables in the agreed structure.

  4. Cross-check

    The file is cross-checked and reviewed before handover.

  5. Handover & support

    Deliver BOQ, estimate sheets, and support explanation within the agreed scope.

Why Choose Us

Capability is shown through process and handover files.

Controlled process

Work is separated into clear steps and reviewed before handover.

Reviewable files

BOQ and estimate sheets are structured for easier checking.

MEP focus

Focused on quantity take-off and estimating for electrical, mechanical, and plumbing systems.

Vietnam-Japan coordination

Support for requirements, templates, and documents in Vietnam-Japan project environments.

FAQ

Frequently Asked Questions

Basic information before sending a consultation request.

What documents are needed for a quotation?

Please send drawings, work scope, format requirements, and expected timeline. If the file is incomplete, our team will note what needs to be added.

How long does an estimate take?

Timing depends on project scale, level of detail, and condition of input documents. We discuss schedule after reviewing the scope.

Which drawing formats do you support?

We can review common drawing and technical document formats based on the scope agreed with the client.

Can we request quantity take-off only?

Yes, this can be discussed separately when the input scope and handover format are confirmed in advance.

What handover formats are available?

Handover is typically Excel/PDF or an agreed client template within the work scope.

How are project drawings and information handled?

Project documents are used for performing the agreed service scope with the client.

Request Consultation

Need MEP estimation for your project?

Send drawings and work scope so our team can review them and advise on a suitable approach.

Send consultation request